The Problem

which had previously been repaired with cement/concrete material, which had failed after a period of time due to vibrations from the pumps. The customer was looking for a more permanent long term solution for the application.

Application Situation

After carrying out a site survey, Belzona 7111 Chocking compound was recommended for the repair of the five plinths. All loose concrete was removed back to solid concrete. Shuttering was cut to size, coated with a release agent and assembled around the plinths. Belzona 7111 was mixed and poured into the dammed voids and allowed to cure. Once cured, shuttering was removed.

Application Solution

Rebuilding of the plinths was performed in accordance with leaflet (FPA-01). Manual hand tools were used to remove loose debris and the shuttering was treated with a release agent. Belzona 7111 was poured into the shuttering.

Belzona Benefits

Belzona 7111 is a long term, durable chocking compound that is a viable replacement for concrete plinths to withstand physical and thermal shocks.